{"id":2708,"date":"2026-07-08T18:24:41","date_gmt":"2026-07-08T17:24:41","guid":{"rendered":"https:\/\/zawaya24.com\/fr\/?p=2708"},"modified":"2026-07-08T18:24:41","modified_gmt":"2026-07-08T17:24:41","slug":"lonee-lance-la-future-step-el-menzel-de-362-mw","status":"publish","type":"post","link":"https:\/\/zawaya24.com\/fr\/lonee-lance-la-future-step-el-menzel-de-362-mw\/","title":{"rendered":"L\u2019ONEE lance la future STEP El Menzel de 362 MW"},"content":{"rendered":"<p class=\"isSelectedEnd\" dir=\"ltr\">L\u2019Office National de l\u2019\u00c9lectricit\u00e9 et de l\u2019Eau potable a lanc\u00e9 un appel d\u2019offres international pour la r\u00e9alisation de la station de transfert d\u2019\u00e9nergie par pompage El Menzel, dot\u00e9e d\u2019une capacit\u00e9 de 362 m\u00e9gawatts. Cette initiative s\u2019inscrit dans la strat\u00e9gie \u00e9nerg\u00e9tique nationale visant \u00e0 moderniser le syst\u00e8me \u00e9lectrique marocain et \u00e0 soutenir la transition \u00e9nerg\u00e9tique.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\">La future infrastructure sera construite \u00e0 environ 35 kilom\u00e8tres au sud-est de S\u00e9frou, dans la r\u00e9gion de F\u00e8s-Mekn\u00e8s. Le march\u00e9 couvre les \u00e9tudes d\u2019ex\u00e9cution, la fourniture des \u00e9quipements, les travaux de construction et d\u2019installation ainsi que l\u2019exploitation de la station dans le cadre d\u2019un contrat EPC.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\">Le projet r\u00e9pond aux besoins croissants de stockage de l\u2019\u00e9lectricit\u00e9 li\u00e9s au d\u00e9veloppement des \u00e9nergies renouvelables. Les stations de transfert d\u2019\u00e9nergie par pompage permettent de stocker l\u2019\u00e9nergie gr\u00e2ce au transfert d\u2019eau entre deux r\u00e9servoirs situ\u00e9s \u00e0 des altitudes diff\u00e9rentes, puis de la restituer au r\u00e9seau lorsque la demande augmente.<\/p>\n<p class=\"isSelectedEnd\" dir=\"ltr\">La STEP El Menzel s\u2019ajoute au dispositif national de stockage hydro\u00e9lectrique compos\u00e9 des stations d\u2019Afourer et d\u2019Abdelmoumen d\u00e9j\u00e0 en exploitation. Elle rejoint \u00e9galement la future station d\u2019Ifahsa actuellement en d\u00e9veloppement. Le chantier devrait \u00eatre achev\u00e9 dans un d\u00e9lai de 48 mois gr\u00e2ce \u00e0 un financement mobilis\u00e9 aupr\u00e8s de la Banque islamique de d\u00e9veloppement. La date limite de d\u00e9p\u00f4t des offres est fix\u00e9e au 30 septembre 2026.<\/p>\n<p dir=\"ltr\">\u00c0 travers ce projet, l\u2019ONEE renforce les capacit\u00e9s nationales de stockage \u00e9nerg\u00e9tique afin de soutenir la s\u00e9curit\u00e9 d\u2019approvisionnement, la souverainet\u00e9 \u00e9nerg\u00e9tique et les objectifs de d\u00e9veloppement durable du Maroc.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>L\u2019Office National de l\u2019\u00c9lectricit\u00e9 et de l\u2019Eau potable a lanc\u00e9 un appel d\u2019offres international pour&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2709,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[1947,2741,1460,2739,2740],"class_list":["post-2708","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-environment","tag-energies-renouvelables","tag-infrastructure-energetique","tag-onee","tag-step","tag-stockage-energetique"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/posts\/2708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/comments?post=2708"}],"version-history":[{"count":1,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/posts\/2708\/revisions"}],"predecessor-version":[{"id":2710,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/posts\/2708\/revisions\/2710"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/media\/2709"}],"wp:attachment":[{"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/media?parent=2708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/categories?post=2708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zawaya24.com\/fr\/wp-json\/wp\/v2\/tags?post=2708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}