{"id":718,"date":"2026-06-21T12:06:45","date_gmt":"2026-06-21T11:06:45","guid":{"rendered":"https:\/\/zawaya24.com\/en\/?p=718"},"modified":"2026-06-21T12:17:12","modified_gmt":"2026-06-21T11:17:12","slug":"hyundai-rotem-secures-487-million-morocco-train-maintenance-deal","status":"publish","type":"post","link":"https:\/\/zawaya24.com\/en\/hyundai-rotem-secures-487-million-morocco-train-maintenance-deal\/","title":{"rendered":"Hyundai Rotem secures $487 million Morocco train maintenance deal"},"content":{"rendered":"<p dir=\"ltr\" data-start=\"71\" data-end=\"356\">Hyundai Rotem has secured a KRW 748.2 billion, equivalent to $487.3 million, contract to maintain and repair Morocco\u2019s new fleet of double-decker electric trains. The agreement covers a 20-year maintenance period for 440 railcars delivered to Morocco\u2019s national railway operator, ONCF.<\/p>\n<p dir=\"ltr\" data-start=\"358\" data-end=\"640\">The signing took place at ONCF headquarters in Rabat, where Hyundai Rotem chief executive Lee Yong-bae and ONCF Director General Mohamed Rabie Khlie formalized the deal. The contract marks the largest overseas rail maintenance agreement ever signed by the South Korean manufacturer.<\/p>\n<p dir=\"ltr\" data-start=\"642\" data-end=\"999\">The maintenance structure is based on a joint venture between Hyundai Rotem and ONCF. The company will supply spare parts, operate a dedicated support service, and provide technical assistance for heavy maintenance operations. These operations include inspection, testing, repair, and component replacement to ensure safety and performance across the fleet.<\/p>\n<p dir=\"ltr\" data-start=\"1001\" data-end=\"1284\">The deal follows a larger agreement signed in February 2025, when Hyundai Rotem won a KRW 2.2 trillion order to produce 440 double-decker electric multiple units. The trains will operate at speeds of up to 160 km\/h and will connect Casablanca with major urban centers across Morocco.<\/p>\n<p dir=\"ltr\" data-start=\"1286\" data-end=\"1563\">The maintenance program extends Hyundai Rotem\u2019s role beyond manufacturing into long-term operational support within Morocco\u2019s rail system. The company expects the partnership to strengthen its presence in African railway markets and support Morocco\u2019s transport expansion plans.<\/p>\n<p dir=\"ltr\" data-start=\"1565\" data-end=\"1842\">According to Hyundai Rotem, spare parts for the maintenance operations will be supplied by more than 200 Korean small and mid-sized companies linked to its industrial network. The company says the arrangement will support industrial cooperation between South Korea and Morocco.<\/p>\n<p dir=\"ltr\" data-start=\"1844\" data-end=\"2148\">On the same day, Korea Railroad Corporation, known as KORAIL, signed a separate KRW 9 billion contract worth about $6 million with ONCF. The 38-month agreement covers consultancy services, including design review, quality control, pre-shipment inspections, trial runs, and final acceptance of the trains.<\/p>\n<p dir=\"ltr\" data-start=\"2150\" data-end=\"2331\">Morocco continues to expand its rail infrastructure ahead of the 2030 FIFA World Cup. The country already operates Africa\u2019s only high-speed rail line between Tangier and Casablanca.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hyundai Rotem has secured a KRW 748.2 billion, equivalent to $487.3 million, contract to maintain&#8230;<\/p>\n","protected":false},"author":1,"featured_media":719,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[380,382,379,381],"class_list":["post-718","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economie","tag-hyundai-rotem","tag-korea-morocco-cooperation","tag-morocco-rail","tag-train-maintenance"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/posts\/718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/comments?post=718"}],"version-history":[{"count":1,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/posts\/718\/revisions"}],"predecessor-version":[{"id":720,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/posts\/718\/revisions\/720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/media\/719"}],"wp:attachment":[{"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/media?parent=718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/categories?post=718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zawaya24.com\/en\/wp-json\/wp\/v2\/tags?post=718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}